Southwest Colorado: U.S. 160 Piedra River bridge closed until a temporary bridge goes in, slated for January
CDOT said Nov 10 that U.S. 160 at the Piedra River bridge has been fully closed since Oct. 31, when floodwaters collapsed its piers, and the bridge needs a full rebuild; a contractor is building a temporary bridge on a temporary alignment, slated for installation by January 2027. Wolf Creek Pass (U.S. 160) is expected to reopen within a week, weather permitting, with one-lane alternating traffic. CO 151 south of Chimney Rock is expected to reopen before Thanksgiving, which CDOT says would cut the Durango-Pagosa Springs drive from about 3.5 hours (via New Mexico) to about 1.5. CDOT points travelers to COtrip.org.