Pagosa Springs flood recovery: U.S. 160 still closed, no reopening date
A Nov 9 search found no reopening date. CDOT's damage report says the Piedra River bridge piers collapsed and a temporary bridge is to be installed as soon as possible; the Durango Herald reported CDOT lists the bridge and the Wolf Creek Tunnel to South Fork section as priorities before winter. As of Nov 5, the town said most mandatory evacuations were lifted Nov 3, orders remained on Hermosa and San Juan streets, residents were asked to limit water use and avoid the San Juan River, and federal assistance had not been approved. Check cotrip.org for current status.